GEF Technologies Sdn Bhd
NO 21 , Jalan S.B. Jaya 14, Taman Industri Sungai Buloh Jaya,
47000 Sungai Buloh, Selangor Darul Ehsan, Malaysia.

Tel: +6-03-6142 2287 / 6142 2289 Fax: +6-03-6142 3288 Website: www.gef.com.my

Mobile: +6-012-238 1308 , +6-012-2011 280 , +6-012-720 2063 , +6-012-708 7010

Email: ktcheongatgef@gmail.com, nicholasatgef@gmail.com, salmiahatgef@gmail.com

   
GEF Technologies Logo
  Home | About Us | Our Services | Our Workshop & Facilities | Awards & Certificates  
Our Services > 4. Overhaul & Rewind Transformer
Click on image to view in original size
i. Overhaul Service HT Transformer
ii. Repairing & Refurbishment - HT Transformer
iii. Complete Overhaul Service - HT Transformer
iv. Complete Rewind - HT Transformer
On Site Overhauling 1 x Unit 45MVA, 132 kV / 11kV,
Oil Immerse Transformer
Oil Purification & Filtration Process   To replace the old gasket (Existing Gasket)
Oil Purification & Filtration Process To replace the old gasket (Existing Gasket)
To Set Up A Scaffolding , Canvas For Working Environment To Check & Re-confirm No Oil Leaking After Service
To Set Up A Scaffolding , Canvas For Working Environment To Check & Re-confirm No Oil Leaking After Service
Oil Leaking In Chamber Box-Before Changing Of New Gasket After Changing Of Gasket-No Oil Leaking
Oil Leaking In Chamber Box-Before Changing Of New Gasket After Changing Of Gasket-No Oil Leaking
 
i. Overhaul Service HT Transformer
 
Complete Overhaul 1 x Unit 2000 kVA, 30 kV / 3.3kV
General Electrical Transformer
Oil Purification & Filtration at GEF Works   Oven cure The Transformer Winding at GEF Workshop
Oil Purification & Filtration at GEF Works   Oven cure The Transformer Winding at GEF Workshop
Before Changing The Damaged Temperature Gauges After Changing The Damaged Temperature Gauges
Before Changing The Damaged Temperature Gauges After Changing The Damaged Temperature Gauges
To Conduct High-Pressure Test Of Transformer At GEF Works To Record And Measure The Insulation Resistance Readings
To Conduct High-Pressure Test Of Transformer At GEF Works To Record And Measure The Insulation Resistance Readings
Complete Repairing & Refurbishment of 1 x Unit 27.5 MVA, 33kV Cast Resin Type Transformer
Unloading the Cast Resin Transformer at GEF Works   Rewinding The Cast Resin Transformer
Unloading the Cast Resin Transformer at GEF Works   Rewinding The Cast Resin Transformer
 
ii. Repairing & Refurbishment -
HT Transformer
 
Complete Overhaul 1 x Unit 2000kVA, 11kV,
Oil Immerse Transformer
Lifting Up Transformer Winding with GEF Overhead Crane   Inspection Of Transformer Damaged Part
Lifting Up Transformer Winding with GEF Overhead Crane   Inspection Of Transformer Damaged Part
Dismantle Transformer at Customer's Jobsite   Inspection Of Transformer Damaged Part
Dismantle Transformer at Customer's Jobsite   Inspection Of Transformer Damaged Part
 
iii. Complete Overhaul Service -
HT Transformer
 
Complete Rewind 2 x Unit 1600kVA, 11kV, Oil Immerse Transformer
Rewinding the transformer at GEF workshop   Inspection of The Rewinding works
Rewinding the transformer at GEF workshop Inspection of The Rewinding works
 
iv. Complete Rewind - HT Transformer
 
Copyright © GEF Technologies Sdn Bhd. All Rights Reserved.